Skip to content
Blog Pre Trip Readiness On Time Performance

Operations

How Pre-Trip Readiness Helps Protect On-Time Performance

On-time performance is usually decided long before the appointment window. The information that predicts a late arrival often exists hours earlier.

Checkpoints, not guesses

  • T-6H — driver, equipment and location awareness
  • T-3H — readiness confirmation
  • T-1H — final position and risk check
  • Arrival — check-in confirmed

The purpose is not surveillance. It is to identify readiness and late-risk problems before the scheduled arrival, whenever the available information allows it.

Want this handled for your fleet?

Talk to FleetFlow ↗